Last updated: September 6, 2025 TL;DR "Over 500 job shops have implemented the Velocity Scheduling System, achieving results such as a 198% mean increase in productivity, 42% mean increase in on-time delivery, 87% mean reduction in WIP, and 82% mean reduction in...
Reviews & Testimonials & Case Studies
Velocity Scheduling System Case Studies
From less than 50% to over 90% on-time. Lead-times through shop reduced from 10.9 days to 4.8 days.From 69% to over 96% on-time.Shipping increased 64% while profits increased 25%.From 88 to 98% on-time with less chaos. Better and increased communication lead to a 15%...
On Time Delivery KPI
Last updated: Aug 27, 2025 This letter (below) was sent by an actual Velocity Scheduling System client to some of their customers with whom they had a poor on time delivery KPI. Their name and phone number have been removed. Here's was their on-time delivery graph...