Job shop Doubles profit with Velocity Scheduling System

by

We have an interesting challenge in that we are a custom job shop but are now adding some production that has annual requirements for 100,000 piece runs, and those runs will take a cell with 1 CNC lathe and 2 CNC mills at minimum running 20 hours each day. The rest of the shop changes over every other day or so. We use a modified version of the “Velocity Scheduling System” and have mproved our on time delivery by 20% and our profit by 100%.    Keith Garrison