Custom Job Shops and Machine Shops Improve DRAMATICALLY!

by

By Dr Lisa Lang

Wouldn’t it be great to improve your due date performance to 100%, reduce the chaos and add $900,000 to your bottom line in less than 3 months like Ricky discusses in this video?

https://vimeo.com/13109539 (Click this link to watch Ricky’s video.)

And listen look how fast the results come:

[youtube=http://www.youtube.com/watch?v=NwS8dUDoatw]

And how this shop that was 95% on time and only took 3.4 days to go through the shop when they STARTED still got benefits from the program:

[youtube=http://www.youtube.com/watch?v=oNdyp8mA0KI]

This shop dramatically improved their due date performance, enhanced communication and reduced chaos! And they dramtically reduced their lead-time, but listen to what Butch likes best about the Velocity Scheduling System:

[youtube=http://www.youtube.com/watch?v=Pn6BczPsC6o]

More Velocity Scheduling System testimonials are here –> https://www.velocityschedulingsystem.com/testimonials/

Share and Enjoy:
  • Twitter
  • Facebook
  • LinkedIn
  • Print
  • email
  • RSS
  • del.icio.us
  • Digg
  • Google Bookmarks

{ 0 comments… add one now }

Leave a Comment

 

Previous post:

Next post: